The affected land, located within the Diplomatic Zone, Katampe Extension in the Federal Capital Territory, was originally allocated on March 18, 2008, to 10 embassies for diplomatic residential purposes, while a portion was also reserved for the Power Holding Company of Nigeria for a 132/133KV power station.